Improper Installation of Stress Control

By: IMCORP

A newly installed critical cable system experiencing multiple cable and accessory failures shortly after commissioning. The sites' underground cable system had initially been tested using a very low frequency (VLF) method, but after multipl... Read Article


Termination Failure at a Wind Farm

By: IMCORP

This client used Factory Grade® technology to commission a shielded power cable system, linking a substation with a generation plant. We found twelve cable terminations on the substation end of the circuits performing well below t... Read Article