IMCORP

IMCORP CASE STUDIES

IMCORP CASE STUDIES

Case Studies

Utilities

Safety and Reliability for a Senior Community

880X440 Safety and Reliability for a Senior Community Case Study 102020

Commissioning of Underground Transmission Systems

880X440 Commissioning of High Voltage Transmission Systems

Using Factory Grade® Technology to Ensure International Airport Grid Reliability

880X440 CLT International Airport Grid Reliability v2 1119

Going Head to Head with tangent delta - Factory Grade® Technology pinpoints severe defects tangent delta tests missed

880x440 Head to Head TD vs FGT 3

Pre-Molded Joint Installation Error

880X440 Using Factory Grade Technology to Ensure Critical Infrastructure Reliability

Using Factory Grade® Technology to Ensure Critical Infrastructure Reliability

880X440 Using Factory Grade Technology to Ensure Critical Infrastructure Reliability

Identifying Workmanship Installation Issues at a Solar Site

880X440 Identifying Workmanship Solar Site

Airport Power System Protected From Systemic Installation Defects

MTUA Defect findings 880x440

Monitoring Detects Failing Joint at Critical Facility

880X440 Airport Sysytems

Using Factory Grade® Technology to Identify Damaging Commissioning Test

880X440 identify damaging commissioning

Pre-Molded Joint Installation Error

880X440 identify workmanship issues

Failing Feeder Cable Joints with Installation Error

880X440 Failing Feeder Cable Joints with Installation Error

VLF Test Passed Cable Systems with Systemic Manufacturing Defects

880X440 identify Identifying Oversized Joints

Manufacturing Molding Issue Identified with IMCORP Factory Grade® Technology

880X440 Manufacturing Molding Issue Identified

Identifying Oversized Joints

880X440 Identifying Oversized Joints

CenterPoint Energy Uses IMCORP's Factory Grade® technology to Breathe New Life into Aging Underground Loops, Boost Electric Reliability and Reduce Costs

CenterPoint 440x220

Major Southeastern utility enjoys dramatic drop in system-wide failures using IMCORP’s Factory Grade® technology

Duke casestudy 440x220 post

The case for a standardized commissioning test

EDF casestudy 440x220 post

The case for a standardized commissioning test

MAXIMIZING WIND FARM REVENUE 440x220 11_28_30_16

Case Studies

Utilities

Safety and Reliability for a Senior Community

880X440 Safety and Reliability for a Senior Community Case Study 102020

Commissioning of Underground Transmission Systems

880X440 Commissioning of High Voltage Transmission Systems

Using Factory Grade® Technology to Ensure International Airport Grid Reliability

880X440 CLT International Airport Grid Reliability v2 1119

Going Head to Head with tangent delta - Factory Grade® Technology pinpoints severe defects tangent delta tests missed

880x440 Head to Head TD vs FGT 3

Pre-Molded Joint Installation Error

880X440 Using Factory Grade Technology to Ensure Critical Infrastructure Reliability

Using Factory Grade® Technology to Ensure Critical Infrastructure Reliability

880X440 Using Factory Grade Technology to Ensure Critical Infrastructure Reliability

Identifying Workmanship Installation Issues at a Solar Site

880X440 Identifying Workmanship Solar Site

Airport Power System Protected From Systemic Installation Defects

MTUA Defect findings 880x440

Monitoring Detects Failing Joint at Critical Facility

880X440 Airport Sysytems

Using Factory Grade® Technology to Identify Damaging Commissioning Test

880X440 identify damaging commissioning

Pre-Molded Joint Installation Error

880X440 identify workmanship issues

Failing Feeder Cable Joints with Installation Error

880X440 Failing Feeder Cable Joints with Installation Error

VLF Test Passed Cable Systems with Systemic Manufacturing Defects

880X440 identify Identifying Oversized Joints

Manufacturing Molding Issue Identified with IMCORP Factory Grade® Technology

880X440 Manufacturing Molding Issue Identified

Identifying Oversized Joints

880X440 Identifying Oversized Joints

CenterPoint Energy Uses IMCORP's Factory Grade® technology to Breathe New Life into Aging Underground Loops, Boost Electric Reliability and Reduce Costs

CenterPoint 440x220

Major Southeastern utility enjoys dramatic drop in system-wide failures using IMCORP’s Factory Grade® technology

Duke casestudy 440x220 post

The case for a standardized commissioning test

EDF casestudy 440x220 post

The case for a standardized commissioning test

MAXIMIZING WIND FARM REVENUE 440x220 11_28_30_16